General Information
Provider
CyrusOne
Colo Space
2,000,000 SF
Airport
N/A
Year Built
N/A
Security
On-site
Uptime
100%
Hyperscale
Enabled
Retail
Available
Wholesale
Available
Interconnectivity
Available
Overview
The nation's largest data center campus sits on 85 acres slated to ultimately support nearly 2 million square feet of data center space in Chandler, Arizona. There is room for ten buildings on this campus, all built with leading-edge Massively Modular® Engineering, making this CyrusOne data center campus unique. The Phoenix data center is well-suited for enterprise clients that require a robust data center infrastructure for mission-critical applications. This location is in an area considered one of the safest in the country: free from natural disasters including seismic activity, tornados and hurricanes.
Certifications
Power & Infrastructure
Power Density
Varies by building, supports high-density configurations
Utility Feeders
Multiple substations with 56MVA transformers
UPS
4 to make 3 distributed redundant topology (N+1)
Standby Power
Multiple generators per building (N+1)
Cooling
Varies by building: Air cooled chillers (ACC), Indirect-direct evaporative cooling (IDEC), and air handlers (AHU) (N+1)
Flood Zone
Outside flood zone
Seismic Rating
Low risk
Fire Suppression
VESDA with fully sprinklered, dual-action interlocking system
Fire Detection
VESDA with fully sprinklered, dual-action interlocking system
Amenities
- Fully secured site perimeter fence with access control
- 36-inch raised floor Data Hall design
- On-site security guards
- Key card and biometric access control
- Secure access turnstile
- Secured and unsecured conference rooms
- Multiple data halls across campus buildings
Other Information
Network Providers
Onsite substation for utility power